Rosewood Resort & Branded Residences — Red Sea
1TB02011 — 011C43 RSC
Rosewood Resort & Branded Residences
Concrete and structural steel package for the Rosewood Resort & Branded Residences at the Red Sea development.
Document control focus: Document control, submittal tracking, transmittals and project record books for the concrete and structural steel package.
Six Senses Resort & Branded Residences — Red Sea
1TB02011 — 017C28
Six Senses Resort & Branded Residences
Concrete and structural steel package for the Six Senses Resort & Branded Residences at the Red Sea development.
Document control focus: Controlled document distribution, metadata management and handover dossiers for the structural package.
Four Seasons Resort & Branded Residences — Red Sea
1TB02012 — 012C30
Four Seasons Resort & Branded Residences
Concrete works package for the Four Seasons Resort & Branded Residences at the Red Sea development.
Document control focus: Submittal and transmittal management, QAQC records and project close-out documentation.
Tanajib Airport Expansion Project
Package 08 — BI-08643-0004
Saudi Aramco — Zuluf Increment Projects Department
Engineering, procurement and construction of the Tanajib Airport Expansion under the Zuluf Increment program.
Document control focus: Lead document control, Procore and Aconex administration, Project Record Books and Aramco handover packages.
Saudi Aramco Built Government Schools (SABGS) — E-Type Schools Replacement Program Phase II
Multiple E-Type Schools
Saudi Aramco
Engineering, procurement, construction and pre-commissioning for the replacement program, including Safwa Girls Elementary School and Khobar Girls Elementary School.
Document control focus: Document control, quality dossiers, as-built documentation and handover records for school replacement projects.
Upgrade Fire Protection & Industrial Drainage System — Turaif Bulk Plant
Fire Protection & Industrial Drainage Upgrade
Saudi Aramco
Procurement and construction works for the upgrade of fire protection and industrial drainage systems at the Turaif Bulk Plant.
Document control focus: Document tracking, inspection records, material submittals and final project handover documentation.